HOME ABOUT HTF UNIQUE CONVENTIONAL OUR FACILITY CONTACT US

 

 


Our Facility



  • Our manufacturing plant is located in the Sturgeon Bay, Wisconsin industrial park at 1447 Shiloh Road.

  •  This 13,000 sq. ft., high bay steel building is specifically configured for manufacturing both large and medium sized heat treating equipment.

  • It contains the CAD stations, panel shop, tools, machinery, material handling equipment and utilities needed to efficiently fabricate, assemble and test both our gas and electric fired products in house. In addition, we have refractory pouring and curing capabilities.

  • It also has oversized ground level doors which allow us to load assembled units sized up to the maximum permitted "over the road" dimensions and weight.

  • Thus, we are able to insure that your furnace arrives ready to plug and play and that disruption in your  facility is the least possible.

  • We cordially invite you to visit anytime.